Manual Adjustments After AI Scheduling

AI Schedule produces a construction-logical starting point. Manual adjustments let you encode project-specific constraints the AI cannot know: client access restrictions, equipment availability windows, phased handover dates, or contractual milestone pins.

URA Analysis โ€” Manual

A Unit Rate Analysis (URA) is a breakdown of the cost components โ€” materials, labour, and equipment โ€” that make up the unit rate for a matched BOQ item. A manual URA lets you build this breakdown by hand, without AI.