Skip to main content

One doc tagged with "critical path"

View all tags

4D/5D Scheduling Overview

The 4D/5D schedule page opens in a separate browser tab from the main Conio interface. When you click the schedule link from within a project, Conio opens a dedicated scheduling workspace at the same localhost:8000 address. This separation keeps the heavy Gantt rendering isolated from the main estimating workflow, and allows you to have the schedule and the cost workspace open side by side.